Nelson Consulting Inc.

Vermejo Park Ranch

NCI provided environmental oversight for the development and infrastructure of the Raton Coal Gas for the Turner Corporation. Included in the development oversight was the drilling of 36 wells, two Salt Water Disposal Wells, construction of access roads, electric lines, a local gathering system, two compressor stations, and a 16-mile 16-inch mainline pipeline.

Client: Turner Corporation

© 2012 Nelson Consulting Inc.